
Pop Rotterdam Down
At the Eurofiber PoP in Rotterdam a core device became defect. The engineer is on his way, estimated time of arrival is 16:15.
Incident resolved
Updates
Sorted by — Most recent
- Resolved6/16/202215:45
POP Rotterdam
Our supplier has just arrived on location and is making preparations to replace the node.
E.t.r. is yet unknown.
- Resolved6/16/202214:30
POP Rotterdam
A power cycle of the node had no result.
Our supplier has been busy the last our with preparing a spare node and will go on route for the replacement.
E.t.a. is around 17:30